DMARC’s 2026 revision removed pct=, which asked receivers to apply the policy to a percentage of failing mail, and replaced it with a simpler switch: t=y, test mode, under which receivers apply one level below the policy you publish.
| Syntax | t=y | t=n |
| t=y with p=reject | Receivers quarantine instead |
| t=y with p=quarantine | Receivers apply none instead |
| Default | t=n — the policy as published |
| pct= | Removed in RFC 9989 |
| Defined in | RFC 9989 Appendix A.6 |
What it does
pct was meant for gradual rollouts, but RFC 9989 records that in practice it was only applied reliably at 0 or 100, and that pct=0 had come to be used as a signal for intermediaries to handle the message differently — typically rewriting the From address. So the revision keeps that one useful step and gives it its own name: t=y says “I am testing this policy”, and the receiver acts one level down — reject becomes quarantine, quarantine becomes none — while reports carry on as normal. t=y also invites intermediaries such as mailing lists to apply their special handling.
Records written before the change still contain pct. RFC 9989 no longer registers it, and receivers must ignore tags that are not registered, so a receiver following the new standard applies your policy to all failing mail — even with pct=0. Receivers that have not caught up may still honour pct for a while.
Examples
v=DMARC1; p=reject; t=y; rua=mailto:dmarc@example.com
A trial of reject: failing mail is quarantined for now.
v=DMARC1; p=quarantine; pct=25; rua=mailto:dmarc@example.com
An older record. A receiver following RFC 9989 ignores pct and quarantines all failing mail.
See what your own DMARC record says
Every term of your published record, read and explained — including this one.
Common mistakes
- Relying on pct for a gradual rollout: under the current standard it is not applied.
- Leaving t=y in place once the trial is over.
What we recommend
Replace pct with t=y while you trial a policy, then remove t= when the reports are clean.
Questions
Do I have to remove pct from my record?
It does no harm to a receiver that ignores it, but it no longer does what it says. Replace it with t=y if you meant a trial — including pct=0, which t=y is the direct replacement for — or remove it if you meant the full policy.
Sources
Checked on 25 September 2026 against these official sources: